EN
CN
Innovative Creation
Constructing a Tomorrow of Safety And Intelligence
Cole Mine Government Permited Solution
Provide solutions compliant with government coal mining regulations, such as scenarios involving underground coal mine blasting, suitable for operation in extremely cold environments
Contact
PREVPREV
Solution
Core Components
Performance Configuration
Interface
Application Scenarios
Product Documents
Cole Mine Government Permited Solution
Provide solutions compliant with government coal mining regulations, such as scenarios involving underground coal mine blasting, suitable for operation in extremely cold environments
Core Components
Energy Storage Element Tantalum Electrolytic Capacitor
Igniting Element SMD Resistor
Performance Configuration
  • Delay Setting Mode
    Preset Type(Five Stages)
  • Maximum Delay Time(ms)
    <120
  • Network Capability
    ≤200
  • Communication Distance
    ≤1500m
    Coal Permit Dedicated Line
  • Allowable Leakage Current in Communication Network
    ≤10mA
  • Working Current
    10-15μA
  • Adapted Gunpowder
    Lead Thiocyanate Series, Dinitro/Trinitro Series, Red Lead Silicon Series, etc.
Interface
Welding Φ6.0x29.5
Riveting Φ6.0x32.9
Application Scenarios
Underground coal mine
Operating temperature(℃) -40℃~+85℃
Storage life 24 months

Note: 1.All data are sourced from controlled laboratory conditions.
2.Specialized adaptations are available for projects with specific requisites.

Online Message
Subscribe